799 - 9/19/04 - 22:04
The last section coming down before the last section
containing guy wires.
|
800 - 9/19/04 - 22:06
|
801 - 9/19/04 - 22:07
|
802 - 9/19/04 - 22:11
|
803 - 9/19/04 - 22:11
|
804 - 9/19/04 - 22:12
Almost done.
Only a few sections left.
|
805 - 9/20/04 - 16:57
Only one guy wire left to remove.
|
806 - 9/20/04 - 19:48
|
807 - 9/20/04 - 19:48
|
808 - 9/20/04 - 21:30
There it is, the last section to be removed.
|
809 - 9/20/04 - 21:30
|
810 - 9/21/04 - 23:46
|
811 - 9/21/04 - 23:54
Twilight photo of the tower.
Not exactly what I was looking for.
|
812 - 9/22/04 - 22:19
Taken about 1:45 before sunset with a polarizer.
Facing east toward the B-C leg.
|
813 - 9/22/04 - 22:19
I need to use the better tripod, as the smaller one did not make
it easy trying to get a perfectly vertical set of shots.
Even though all of the images were shot at the same shutter speed and
f-stop, you'll notice the difference in sky coloration.
Even though there are still some lines attached to the tower,
I wanted to get this scene while there is still daylight and leaves
on the trees.
I will try and get a shot with fall color.
|
814 - 9/25/04 - 15:58
It is cleanup time.
They want to be all packed up and have the tower signed off
sometime Monday.
|
815 - 9/25/04 - 15:59
The yard is getting cleaned up.
You'll notice that the carpet that was on the ground
underneath the hoist cables are now gone.
|
816 - 9/25/04 - 15:59
You'll also notice that the tool truck is now parked
where the yellow "horse" used to be.
That got packed up Friday.
|
817 - 9/25/04 - 16:00
|
818 - 9/25/04 - 16:05
A couple of shots of the old tower sections.
|
819 - 9/25/04 - 16:06
|
820 - 9/25/04 - 16:06
The very bottom section of the old tower is being left behind
because of all the cable that go through it.
|
821 - 9/25/04 - 16:07
Another shot, from a different angle,
of the old tower sections.
|
Notice a bunch of the old guy wire as well.
|
823 - 9/25/04 - 16:08
While looking at the old sections,
I noticed the writing on the top of the top section.
|
824 - 9/25/04 - 16:09
I asked him when he did it and he said it was when he broke all
of the bolts loose before they moved the antenna from the old
tower to the new.
Dave also mentioned that the new tower has names all over it. :-)
There is even other writing, that I won't repeat here. :-)
|
825 - 9/25/04 - 16:23
A view of the completed tower, facing west toward the A leg.
All of the hoist cables and trolley ropes have been removed.
The hoist cable is lowered with a trolley rope.
The trolley rope can't be lowered.
They went way out into the baseball field (between legs A and B),
tensioned the rope real tight and then cut it.
The rope then "shoots" toward the ground and coils up relatively nice.
The pulley is then removed and carried down the tower.
Dave said that it took him about a half hour to climb down the tower.
|
826 - 9/25/04 - 19:19
Putting the Cat back together.
|
827 - 9/25/04 - 19:57
|
828 - 9/25/04 - 20:12
Dave is testing it to make sure that everything is working properly.
|
829 - 9/25/04 - 20:20
It was. Brax used the Cat to do dumpster crushing,
as more junk needed to go in it.
|
830 - 9/25/04 - 20:31
One of the flatbeds is getting the last of its stuff put on it.
|
831 - 9/25/04 - 20:35
|
832 - 9/25/04 - 20:38
You know for sure that it is time to go when the carpet gets
rolled up and put in the trash.
|
833 - 9/25/04 - 20:40
With the trash placed on the truck, and the carpet and old
wooden shelf attached behind, ...
|
834 - 9/25/04 - 20:41
... it is hauled off to the dumpster.
|
835 - 9/25/04 - 20:43
Remember many photos ago I mentioned that the generator wasn't
very well protected?
Well, as you can see, they've erected an ice shield over it.
(They being the people working on the building, not the tower crew.)
|
836 - 9/25/04 - 20:43
The truck is now at the dumpster and the junk is being thrown in.
|
837 - 9/25/04 - 20:44
Except that the buckets are being crushed first,
in order to take up less space.
|
838 - 9/25/04 - 20:44
|
839 - 9/25/04 - 20:45
|
840 - 9/25/04 - 20:46
|
841 - 9/25/04 - 20:51
The crushed wooden shelf, at least what is left of it,
is being placed in the scooper for transfer to the dumpster.
|
842 - 9/26/04 - 15:30
The trailer is all packed up and ready to go.
|
843 - 9/26/04 - 15:30
Another trailer, all ready to go and hitched to Brax's truck.
|
844 - 9/26/04 - 15:30
Notice anything about the area covered in this photo?
Yep, it was the area used to assemble the tower sections.
The concrete slabs used to hold the sections were also removed.
|
845 - 9/26/04 - 15:31
Getting the truck ready to haul the trailer that can be seen in the
background.
The trailer will be used to haul the Cat tractor.
|
846 - 9/26/04 - 15:40
|
847 - 9/26/04 - 15:48
|
848 - 9/26/04 - 15:56
Checking the tire pressure on all the trailers and adding air
where needed.
|
849 - 9/26/04 - 16:51
Building a dirt ramp.
|
850 - 9/26/04 - 17:04
So that the tractor can be driven ...
|
851 - 9/26/04 - 17:04
... onto the trailer.
|
852 - 9/26/04 - 21:38
There it is, the completed tower,
from the far end of the parking lot across the street.
|
853 - 9/26/04 - 22:11
Beauty shot of the tower taken from further away.
|
854 - 9/26/04 - 22:12
While the exposure is not right, I did notice that by shear
luck, the shot captured the flash tubes on the tower.
|
855 - 9/26/04 - 22:17
|
856 - 9/26/04 - 22:20
Beauty shot with all of the guy wires visible.
|
Misc Tower Info |
LP-1
Overall land plot.
Contrary to what is shown on the drawing,
Forward Drive does not curve away, it goes straight south.
Same goes for the northern curve.
It goes straight north.
It is a dead end street.
|
TS-1
Overall tower spec.
|
TS-2
Anchor locations.
|
TS-3
Guy wire chart.
|
TS-4
Guy wire placement.
|
TS-5
Antenna/Design Loading Information.
|
TA-1
Tower anchor specs, top view.
|
TA-2
Tower anchor specs, side view.
|
GW-1
Guy wire anchor specs.
|
DA-1
Placement of the digital antenna on the tower.
|
DA-2
Top view of the antenna placement.
|
DA-3
Bottom view of the digital antenna inputs.
|
TB-1
Drawing of section 61, the grating assembly.
Otherwise known as the T-bar.
|
TB-2
Section A-A.
The Ch 15 antenna is on the left, or Y arm and
the Ch 57 antenna is on the right, or Z arm.
|
TB-3
Section B-B.
|
TB-4
Section C-C.
|
TB-5
Sections D-D and E-E.
|
|
Notes:
- There are up to six riggers working up in the tower.
- The very bottom section is 16' and is one foot AGL.
- The next six sections at the bottom are about 26.667'.
- Each remaining section is 20'.
- The T-bar is 11'.
- Currently scheduled date for antenna sticks to be installed: 8/1/04.
- The antennas will be hoisted into place.
- One of the copper signal feeders will carry channel 15.
The other copper feeder will carry a combined 19 and 32 (DTV).
The waveguide will carry channel 57.
- Original images are 2560x1920 - TIFF (5 Mpixel)
- Starting with the 6/15/04 images, they are 3264x2448 - TIFF
(8 Mpixel)
- Enlarged views are 720x540 cuts
- Blowup views are 360x270 cuts enlarged to 720x540
- The EXIF value for the time the shots were taken is CST, not CDT
- Starting with the 6/15/04 images, the EXIF value for the time
the shots were taken is GMT
|